{"id":35,"date":"2014-05-03T18:21:01","date_gmt":"2014-05-03T16:21:01","guid":{"rendered":"http:\/\/www.seewind.org\/wp\/?page_id=35"},"modified":"2025-08-05T13:52:56","modified_gmt":"2025-08-05T11:52:56","slug":"list-of-deliverables","status":"publish","type":"page","link":"https:\/\/www.seewind.org\/?page_id=35","title":{"rendered":"List of deliverables"},"content":{"rendered":"<table>\n<tbody>\n<tr>\n<td width=\"66\">Del. No<\/td>\n<td width=\"216\">Deliverable name<\/td>\n<td>WP no.<\/td>\n<td>Lead Partici-<br \/>\npant<\/td>\n<td>Delivery date<\/td>\n<td>Nature<\/td>\n<td>Dissemi-<br \/>\nnation level<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-1.1<\/td>\n<td width=\"216\">6-monthly project progress reports<\/td>\n<td>1<\/td>\n<td>EWS<\/td>\n<td>6\/12\/18\/24\/30<\/td>\n<td>R<\/td>\n<td>CO<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-1.2<\/td>\n<td width=\"216\">Yearly financial and technical controlling re-ports<\/td>\n<td>1<\/td>\n<td>EWS<\/td>\n<td>12\/24\/36<\/td>\n<td>R<\/td>\n<td>CO<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-2.1<\/td>\n<td width=\"216\">One project web-site, webcam and folders for each pilot site<\/td>\n<td>2<\/td>\n<td>EWS<\/td>\n<td>24<\/td>\n<td>O<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-2.2<\/td>\n<td width=\"216\">Information board and guided visitor tours at the pilot sites<\/td>\n<td>2<\/td>\n<td>EWS<\/td>\n<td>24<\/td>\n<td>O<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-2.3<\/td>\n<td width=\"216\">Brochures about costs of wind energy generation and wind potential in SEE<\/td>\n<td>2<\/td>\n<td>EWS<\/td>\n<td>36<\/td>\n<td>O<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-2.4<\/td>\n<td width=\"216\">Summary of final report ready to be published<\/td>\n<td>2<\/td>\n<td>EWS<\/td>\n<td>36<\/td>\n<td>O<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-2.5<\/td>\n<td width=\"216\">Socio-economic studies at the project sites<\/td>\n<td>2<\/td>\n<td>VE\/AWP\/ Masurica<\/td>\n<td>36<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-2.6<\/td>\n<td width=\"216\">Two conferences on wind energy in complex terrain<\/td>\n<td>2<\/td>\n<td>EWS<\/td>\n<td>12\/36<\/td>\n<td>O<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-2.7<\/td>\n<td width=\"216\">Wind workshop for companies<\/td>\n<td>2<\/td>\n<td>EWS<\/td>\n<td>30<\/td>\n<td>O<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-3.1<\/td>\n<td width=\"216\">Yearly reports (3 years) of long term measurements for each pilot site.<\/td>\n<td>3<\/td>\n<td>EWS<\/td>\n<td>12\/24\/36<\/td>\n<td>R<\/td>\n<td>CO<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-3.2<\/td>\n<td width=\"216\">Reports on short term measurement campaign for each pilot site.<\/td>\n<td>3<\/td>\n<td>EWS<\/td>\n<td>36<\/td>\n<td>R<\/td>\n<td>CO<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-4.1<\/td>\n<td width=\"216\">Documentation of each SODAR and LIDAR measurement campaign<\/td>\n<td>4<\/td>\n<td>MET-SW<\/td>\n<td>24<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-4.2<\/td>\n<td width=\"216\">Results of each SODAR and LIDAR measurement campaign<\/td>\n<td>4<\/td>\n<td>MET-SW<\/td>\n<td>22<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-4.3<\/td>\n<td width=\"216\">Report on typical patterns in the temporal evolution of the vertical wind profile during Bora events<\/td>\n<td>4<\/td>\n<td>MET-SW<\/td>\n<td>24<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-4.4<\/td>\n<td width=\"216\">Comparison of SODAR and LIDAR profiles<\/td>\n<td>4<\/td>\n<td>MET-SW<\/td>\n<td>22<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-4.5<\/td>\n<td width=\"216\">Rating of the suitability of LIDAR for measuring vertical profile of wind speed in complex terrain<\/td>\n<td>4<\/td>\n<td>MET-SW<\/td>\n<td>24<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-4.6<\/td>\n<td width=\"216\">Summary of the WP&#8217;s main conclusions and their relevance to wind energy utilisation<\/td>\n<td>4<\/td>\n<td>MET-SW<\/td>\n<td>24<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-5.1<\/td>\n<td width=\"216\">Long term 10-minute time series of wind data from Mostar met station<\/td>\n<td>5<\/td>\n<td>MET-BIH<\/td>\n<td>8<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-5.2<\/td>\n<td width=\"216\">Report with description of local wind systems and case study results<\/td>\n<td>5<\/td>\n<td>MET-SW<\/td>\n<td>20<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-5.3<\/td>\n<td width=\"216\">Website with 24 h wind forecast for pilot project areas<\/td>\n<td>5<\/td>\n<td>MET-SW<\/td>\n<td>24<\/td>\n<td>O<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-6.1<\/td>\n<td width=\"216\">Report on the development and configuration of the meso-scale modelling system.<\/td>\n<td>6<\/td>\n<td>DEWI<\/td>\n<td>10<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-6.2<\/td>\n<td width=\"216\">Validation of meso-scale simulation and assessment of the short term correlation<\/td>\n<td>6<\/td>\n<td>DEWI<\/td>\n<td>15<\/td>\n<td>R<\/td>\n<td>CO<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-6.3<\/td>\n<td width=\"216\">Meso-scale simulation of long term wind conditions over South East Europe<\/td>\n<td>6<\/td>\n<td>DEWI<\/td>\n<td>17<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-7.1<\/td>\n<td width=\"216\">Description of mean wind, turbulence, wind shear, flow inclination and extreme wind conditions at project sites<\/td>\n<td>7<\/td>\n<td>DEWI<\/td>\n<td>8<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-7.2<\/td>\n<td width=\"216\">Energy yield assessment<\/td>\n<td>7<\/td>\n<td>DEWI<\/td>\n<td>8<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-7.3<\/td>\n<td width=\"216\">Flow model comparison and verification results<\/td>\n<td>7<\/td>\n<td>DEWI<\/td>\n<td>12<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-8.1<\/td>\n<td width=\"216\">Optimized wind farm outline for each pilot site<\/td>\n<td>8<\/td>\n<td>EWS<\/td>\n<td>10<\/td>\n<td>R<\/td>\n<td>CO<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-8.2<\/td>\n<td width=\"216\">Reports on environmental impact statement for pilot sites<\/td>\n<td>8<\/td>\n<td>EWS<\/td>\n<td>8<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-8.3<\/td>\n<td width=\"216\">Reports on results of approval procedures<\/td>\n<td>8<\/td>\n<td>EWS<\/td>\n<td>10<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-9.1<\/td>\n<td width=\"216\">Certification report on the assessment of site specific load assumptions for the wind turbines<\/td>\n<td>9<\/td>\n<td>OCC<\/td>\n<td>10<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-9.2<\/td>\n<td width=\"216\">Site Specific Certificate for the wind turbines<\/td>\n<td>9<\/td>\n<td>OCC<\/td>\n<td>10<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-9.3<\/td>\n<td width=\"216\">Compilation of the national building codes in a technical report<\/td>\n<td>9<\/td>\n<td>UNMO<\/td>\n<td>12<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-10.1<\/td>\n<td width=\"216\">Investment cost for each pilot site based on tendering<\/td>\n<td>10<\/td>\n<td>EWS<\/td>\n<td>14<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-10.2<\/td>\n<td width=\"216\">Evidence of economic efficiency and financing plan for each pilot site<\/td>\n<td>10<\/td>\n<td>EWS<\/td>\n<td>14<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-10.3<\/td>\n<td width=\"216\">Documentation of construction works for each pilot site<\/td>\n<td>10<\/td>\n<td>EWS<\/td>\n<td>14<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-10.4<\/td>\n<td width=\"216\">Three pilot wind turbines at three project locations<\/td>\n<td>10<\/td>\n<td>VE\/AWP\/ Masurica<\/td>\n<td>14<\/td>\n<td>D<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-11.1<\/td>\n<td width=\"216\">Report on operational experience for each pilot site<\/td>\n<td>11<\/td>\n<td>EWS<\/td>\n<td>36<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-11.2<\/td>\n<td width=\"216\">Recalculation of economic efficiency for each pilot site<\/td>\n<td>11<\/td>\n<td>EWS<\/td>\n<td>36<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-12.1<\/td>\n<td width=\"216\">Providing a high quality, high resolution data base for research purposes including report<\/td>\n<td>12<\/td>\n<td>DEWI<\/td>\n<td>25<\/td>\n<td>O<\/td>\n<td>CO<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-12.2<\/td>\n<td width=\"216\">Report on site calibration results with emphasis on the 3D information from the sonic and comparison with the calculated results<\/td>\n<td>12<\/td>\n<td>DEWI<\/td>\n<td>30<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<tr>\n<td width=\"66\">D-12.3<\/td>\n<td width=\"216\">Report on power curve measurements with emphasis on nacelle anemometer based methods<\/td>\n<td>12<\/td>\n<td>DEWI<\/td>\n<td>30<\/td>\n<td>R<\/td>\n<td>PU<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Del. No Deliverable name WP no. Lead Partici- pant Delivery date Nature Dissemi- nation level D-1.1 6-monthly project progress reports [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-35","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.seewind.org\/index.php?rest_route=\/wp\/v2\/pages\/35","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.seewind.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.seewind.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.seewind.org\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.seewind.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=35"}],"version-history":[{"count":3,"href":"https:\/\/www.seewind.org\/index.php?rest_route=\/wp\/v2\/pages\/35\/revisions"}],"predecessor-version":[{"id":51,"href":"https:\/\/www.seewind.org\/index.php?rest_route=\/wp\/v2\/pages\/35\/revisions\/51"}],"wp:attachment":[{"href":"https:\/\/www.seewind.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=35"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}