• SEEWIND
    • News
    • Impressum
  • Basics
    • Executive Summary
    • Objectives
    • Project Organisation
    • List of deliverables
    • Sponsors
  • Partner
    • Adria Wind Power d.o.o. (AWP)
    • Deutsches Wind Energie Institut Gmbh (DEWI)
    • DEWI Offshore and Certification Centre GmbH (OCC)
    • JP Elektroprivreda BiH
    • Energiewerkstatt (EWS)
    • Federal Meteorological Institute of Bosnia and Herzegovina (MET-BIH)
    • Institute for Multidisciplinary Studies (IMSI)
    • Masurica A.D. (Masurica)
    • Meteotest (MET-SW)
    • Univerzitet ‚Dzemal Bijedic‘ u Mostar (UNMO)
    • Vjetroenergetika d.o.o. (VE)
  • Locations
    • Wind farm Podvelez
    • Wind farm Rudine
    • Wind farm Vlasina
    • Contacts
  • Work
    • WP 1 – Project Management
    • WP 2 – Dissemination of results
    • WP 3 – Wind measurements at pilot sites
    • WP 4 – Vertical wind profile in complex terrain
    • WP 5 – Local wind systems
    • WP 6 – Meso-scale Simulations
    • WP 7 – Micro-scale simulations
    • WP 8 – Site Development
    • WP 9 – Certification and standards
    • WP 10 – Construction of pilot wind turbines
    • WP 11 – Evaluation of operational data
    • WP 12 – Power curve measurement
  • Ice & Rocks III
    • General information
    • Proceedings
    • Photos of the event
  • Results
    • Project Results & Deliverables
    • Press Releases
    • Scientific Publications
    • Relevant Links
Impressum
  • SEEWIND
    • News
    • Impressum
  • Basics
    • Executive Summary
    • Objectives
    • Project Organisation
    • List of deliverables
    • Sponsors
  • Partner
    • Adria Wind Power d.o.o. (AWP)
    • Deutsches Wind Energie Institut Gmbh (DEWI)
    • DEWI Offshore and Certification Centre GmbH (OCC)
    • JP Elektroprivreda BiH
    • Energiewerkstatt (EWS)
    • Federal Meteorological Institute of Bosnia and Herzegovina (MET-BIH)
    • Institute for Multidisciplinary Studies (IMSI)
    • Masurica A.D. (Masurica)
    • Meteotest (MET-SW)
    • Univerzitet ‚Dzemal Bijedic‘ u Mostar (UNMO)
    • Vjetroenergetika d.o.o. (VE)
  • Locations
    • Wind farm Podvelez
    • Wind farm Rudine
    • Wind farm Vlasina
    • Contacts
  • Work
    • WP 1 – Project Management
    • WP 2 – Dissemination of results
    • WP 3 – Wind measurements at pilot sites
    • WP 4 – Vertical wind profile in complex terrain
    • WP 5 – Local wind systems
    • WP 6 – Meso-scale Simulations
    • WP 7 – Micro-scale simulations
    • WP 8 – Site Development
    • WP 9 – Certification and standards
    • WP 10 – Construction of pilot wind turbines
    • WP 11 – Evaluation of operational data
    • WP 12 – Power curve measurement
  • Ice & Rocks III
    • General information
    • Proceedings
    • Photos of the event
  • Results
    • Project Results & Deliverables
    • Press Releases
    • Scientific Publications
    • Relevant Links

News

SEEWIND Presentation at EWEA in Vienna

08 Feb 2013
Comment are off
seewind

At the EWEA 2013 Andreas Krenn presented aspects of project development in the former Yugoslavian Countries Croatia, Serbia and Bosnia Herzegovina. He addressed challenges the three SEEWIND Operators Adria Wind Power, Masurica and Elektroprivreda BiH have encountered as well as opportunities of wind farm deployment in those regions.

1492027433

The presentation can be downloaded from the link below:

Project Development in Croatia, Serbia and Bosnia (EWEA 2013)

News

Energiewerkstatt Know-how in the Balkans

25 Mrz 2014

GA Meeting Belgrade

28 Nov 2012

Project Extension granted

01 Okt 2011

General Assembly Meeting Zagreb

04 Mai 2011

Acceptance of EP BiH as new SEEWIND contractor

01 Sep 2010
© 2008 - 2017 by www.energiewerkstatt.org | Consulting Engineers for renewable Energy in Friedburg - Austria